1Substrate inspection and preparation standard
Preparation standard:Concrete substrate grinding / shot blasting
Roughness requirement:CSP 3-5 (ICRI standard)
Cleanliness requirement:Free of oil, laitance and loose particles
Moisture content:Moisture content <6% (CM method)
pH value:pH<10
Crack repair:Cracks >0.5 mm require V-grooving and repair with epoxy mortar
2Paint preparation and mixing
Mixing method:Mix with electric stirrer at 300-500 rpm for 3-5 minutes
Mixing ratio:Mixing ratio as indicated on the product label
Curing:Two-component: induction time 10-15 minutes
Pot life:Pot life after mixing approx. 30-60 minutes (23°C), varies by product
3Environmental condition check
Application temperature:10-30°C (substrate temperature at least 3°C above the dew point)
Relative humidity:relative humidity ≤85%
Ventilation requirements:Good ventilation