1Substrate inspection and preparation standard
Preparation standard:New walls cured for at least 28 days; substrate firm and level
Roughness requirement:per product requirements
Cleanliness requirement:Free of oil, dust and loose particles
Moisture content:Moisture content<10%
pH Value:pH<10
Body filler application:批刮Water-ResistantPutty2-3道,Sanding平整
Primer application:Apply one coat of alkali-resistant sealing primer
2Paint preparation and mixing
Mixing method:Mix evenly with an electric stirrer
Thinning:Dilute with 5-10% clean water as needed (water-borne paint)
3Environmental condition check
Application temperature:5-35°C
Relative humidity:Relative humidity ≤85%
Weather requirements:户外Application避开雨天和大风天