I. Pre-application preparation — Substrate inspection and treatment

1Substrate inspection and preparation standard

Preparation standard:ISO 8501-1 Sa 2.5 (very thorough blast cleaning)

Roughness requirement:Rz 40-75μm(ISO 8503-1)

Cleanliness requirement:Post-blast surface cleanliness Salt grade 2 (ISO 8502-3), no oil/grease or dust

Application timing:Apply primer within 4 h of blasting to prevent flash rust

Edge and corner treatment:Grind free edges to a rounded radius of R≥2 mm

Weld seam treatment:Remove slag and spatter from welds; stripe-coat the welds

2Paint preparation and mixing

Mixing method:Mix at low speed 300–500 rpm for 3–5 min until homogeneous

Mixing ratio:Weigh precisely according to the mix ratio on the product label

Curing:After mixing, let the blend age for 15–30 min at 23°C before use

Pot life:Pot life 4–8 h at 23°C after mixing; discard beyond this window

3Environmental condition check

Application temperature:5-40°C (substrate temperature ≥ dew point +3°C)

Relative humidity:Relative humidity ≤85%

Ventilation requirements:密闭空间强制Ventilation

Weather requirements:Avoid rain / snow / strong wind / direct sun when applying outdoors

II. Application procedure — Selection of coating method
Application methodProcess parametersApplicable scenarios
Airless spray (recommended) nozzle 0.38-0.53 mm, pressure 15-25 MPa Large-area steel structures, storage tanks and pipework
Conventional air spray Nozzle 1.5-2.0mm,Pressure 0.3-0.5MPa Small/medium workpieces and equipment housings
Brush / roller application — Localised touch-up, weld stripe-coating, corners and edges
III. Recoat Interval and Curing

Minimum overcoating interval:Recoat after touch-dry (about 4–6 h at 23°C)

Maximum overcoating interval:If recoat exceeds 7 days, abrade the surface (low-pressure sweep blast 0.2–0.3 MPa, non-metallic abrasive)

⚠ Risk of overcoating beyond the time limit:When the maximum overcoating interval is exceeded, intercoat adhesion will drop significantly; the surface must be sweep-blasted (low pressure 0.2-0.3 MPa, non-metallic abrasive) to create mechanical anchor roughness, otherwise the coating will delaminate.

Curing conditions:Self-cures at 23°C, fully cures in 7 days. Low temperatures (<5°C) require a low-temperature curing agent.

4. Safety and environmental requirements
⚠ PPE requirements: Respirator (A2P2 filter cartridge) + goggles + nitrile gloves + anti-static workwear + safety shoes
⚠ No open flames, welding, cutting or other spark-producing work
⚠ Use explosion-proof electrical equipment in the work area
⚠ Dispose of waste paint and containers according to HW12 category of the National Hazardous Waste List
5. Quality inspection and acceptance criteria
Inspection itemsInspection methodAcceptance criteria
Surface preparation grade ISO 8503 Comparison Specimens Sa2.5 grade, Rz 40-75μm
Dry Film Thickness (DFT) ISO 2808 Electromagnetic Induction Method 80% of test points ≥ specified value, no test points<80%规定值
Adhesion ISO 4624 Pull-off test / ISO 2409 Cross-cut test ≥3-5MPa / Level 0-1
Pinhole / holiday detection High-voltage holiday (spark) testing No pinholes/holidays (coating discontinuities)
Appearance Visual inspection No sagging / blistering / pinholes / craters
Prepared on the basis of:ISO 12944-7/8 | SSPC PA1 | GB/T 28699 and related industry standards.
Important statement:This construction guide is a recommended reference document. Actual construction parameters should be adjusted based on site conditions, environmental circumstances, and coating system requirements. For special working conditions or construction difficulties, please contact the Kexin New Materials Technical Department for professional support.
Technical support:0757-88793275 | www.psste.com | Shunde District, Foshan City, Guangdong Province

Related articles & news

Further reading: technical articles and industry news from Kexin New Materials