1Substrate Inspection and Handling Standards
Handling Standards:ISO 8501-1 Sa2.5 grade (very thorough blast cleaning)
Roughness requirements:Rz 40-75μm(ISO 8503-1)
Cleanliness requirements:Surface cleanliness grade 2 after blasting (ISO 8502-3), free of oil and dust
Application timing:Apply the primer within 4 hours after sandblasting to prevent rust reoccurrence.
Edge treatment:Grind free edges to a rounded corner with R≥2mm.
Weld treatment:Remove weld slag and spatter from welds; apply stripe coat to welds
2Paint preparation and mixing
Mixing Method:Use an electric stirrer at 300-500 rpm, stir at low speed for 3-5 minutes until uniform.
Mixing ratio:Accurately weigh according to the mixing ratio indicated on the product label
Curing:After mixing, let it stand for 15-30 minutes (23°C) before use
Service life:Pot life after mixing is 4-8 hours (23°C); do not use beyond this period.
3Confirmation of environmental conditions
Application temperature:5-40°C (substrate temperature ≥ dew point +3°C)
Relative humidity:Relative humidity ≤85%
Ventilation requirements:密闭空间强制通风
Weather requirements:Outdoor application should avoid rain/snow/strong winds/direct sunlight